Planbox has a four level work breakdown structure, allowing you to configure the system based on how you schedule, track and report project work.

The four levels are:
Modified on: Sun, 29 Apr, 2018 at 4:47 PM
Planbox has a four level work breakdown structure, allowing you to configure the system based on how you schedule, track and report project work.

The four levels are:
Did you find it helpful? Yes No
Send feedback